Client: MTS Centre

Contractors: PCL Constructors

Project: Provide the complete mechanical system for the new 15,000 seat MTS Centre in downtown Winnipeg.

Derksen Group Involvement:

  • Derksen Plumbing and Heating Ltd. (1984)
  • East Side Ventilation
  • BSD Solutions Ltd.

Scope: The Derksen Group was awarded the $10.0M contract by PCL Constructors for tthe complete mechanical system. The project involved some unique challenges including a ring duct and rain water leader system 140 feet above the arena surface located at the roof line. These systems also required the set-up and commissioning of life-safety equipment for the large open area of the arena. Project from start to completion was compressed into an 18 month schedule.


MTS Centre Winnipeg
Brandon Hospital CSRP
Boundry Trails Regional Health Centre
Red River College Princess Street Campus
JR Simplot Food Processing Plant
back to Success Stories

 
line

  Derksen Advantage | Derksen Group | Job Profiles | Contact Us
Home | Site Map | Privacy Policy
@2002 Derksen Group. All rights reserved
Site designed and maintained by Boom Strategy