Client: MTS Centre
Contractors: PCL Constructors
Project: Provide the complete mechanical
system for the new 15,000 seat MTS Centre in downtown Winnipeg.
Derksen Group Involvement:
- Derksen Plumbing and Heating Ltd. (1984)
- East Side Ventilation
- BSD Solutions Ltd.
Scope: The Derksen Group was awarded
the $10.0M contract by PCL Constructors for tthe complete mechanical
system. The project involved some unique challenges including
a ring duct and rain water leader system 140 feet above the arena
surface located at the roof line. These systems also required
the set-up and commissioning of life-safety equipment for the
large open area of the arena. Project from start to completion
was compressed into an 18 month schedule.